CME Work

CME Work involves the design, installation, and integration of supporting infrastructure for technical facilities and specialized environments. These works ensure safe, reliable, and compliant operation of equipment, covering structural modifications, electrical systems, mechanical services, cable routing, and site preparation tailored to project requirements.

RF Shield Box

RF Shield Box-09

The RF Shield Box is a compact, high-isolation enclosure used for testing wireless devices in a controlled RF environment. It prevents signal leakage and external interference, making it ideal for production testing, quality control, and R&D applications.

Shielded Room

Shielded-Room-01

The Shielded Room is a specially constructed enclosure that blocks unwanted electromagnetic signals from entering or leaving the test area. It provides a secure environment for RF testing, product development, troubleshooting, and sensitive electronic measurements.

RFID Chamber

RFID-Chamber-02

The RFID Chamber is designed for reliable testing and validation of RFID systems, tags, and readers. It creates an isolated RF environment that enables accurate performance evaluation, range verification, and compliance testing without external signal disturbances.

Antenna Chamber

Antenna Chamber-cover-watermarked

The Antenna Chamber provides a controlled, low-reflection environment for accurate antenna testing and characterization. It supports radiation pattern, gain, efficiency, and over-the-air (OTA) measurements while minimizing external electromagnetic interference.

EMC Chamber

EMC-chamber-10

The EMC Chamber is a shielded, controlled environment for accurate electromagnetic compatibility and high-frequency testing. It minimizes external interference to ensure reliable measurements for EMC compliance, antenna evaluation, and RF/microwave development.